VESPA 2 Y -Pin made of 1.4301 Stainless Steel
Product number:
10240
Product information "VESPA 2 Y -Pin made of 1.4301 Stainless Steel"
Specifications:
Cover width: up to 100 mm
Pin thickness: 3.5 mm
Thread: 30 mm M4 thread
Pin length: 120 mm
Material: 1.4301 stainless steel
Assembly:
The Y-pins are attached at a distance of approx. 1.5 meters.
Mounting the wires (one spring is mounted per section and 2 sleeves) Cut the stainless steel cable to the appropriate length with a reserve of approx. 20-25 cm.
1. On the pin without spring: The stainless steel cable is passed through the sleeve and then through the hole on the pin. The rope is then pulled through the sleeve again and the resulting loop is tightened to the pin. Crush the sleeve with the clamping pliers – to be on the safe side, squeeze in two places.
2. On the spring: Hook the spring to the pin of the next holder, pull the other side of the rope through the sleeve, then pass it through the other eye of the spring and through the sleeve again. Tighten the end of the rope to tension the spring, push the sleeve forward to the pin, hold on and squeeze the sleeve twice. Pinch off the rest of the rope immediately behind the sleeve.
Application:
Gutter, cornice, snow guard, handrail, railing
Cover width: up to 100 mm
Pin thickness: 3.5 mm
Thread: 30 mm M4 thread
Pin length: 120 mm
Material: 1.4301 stainless steel
Assembly:
The Y-pins are attached at a distance of approx. 1.5 meters.
Mounting the wires (one spring is mounted per section and 2 sleeves) Cut the stainless steel cable to the appropriate length with a reserve of approx. 20-25 cm.
1. On the pin without spring: The stainless steel cable is passed through the sleeve and then through the hole on the pin. The rope is then pulled through the sleeve again and the resulting loop is tightened to the pin. Crush the sleeve with the clamping pliers – to be on the safe side, squeeze in two places.
2. On the spring: Hook the spring to the pin of the next holder, pull the other side of the rope through the sleeve, then pass it through the other eye of the spring and through the sleeve again. Tighten the end of the rope to tension the spring, push the sleeve forward to the pin, hold on and squeeze the sleeve twice. Pinch off the rest of the rope immediately behind the sleeve.
Application:
Gutter, cornice, snow guard, handrail, railing
There aren't any asked questions yet.
